STATE LOAD DESPATCH CENTRE,MPPTCL :JABALPUR
ENERGY BALANCE SHEET FOR DATED:- 09-Jul-2010
Page-2
SL
NO
PARTICULARS UNITS IN
(LU)
MORNING PEAK
MW AT 05:00 Hrs
EVENING PEAK
MW AT 22:00 Hrs
1 THERMAL GENERATION     353.87 1414 1553  
2 HYDEL   GENERATION     21.65 7   230      
3 TOTAL   GENERATION     375.52 1421   1783      
4 AUXILIARY CONSUMPTION     37.38 127   140    
5 MP THERMAL AVAILABILITY (Excl. Aux. Cons.)   316.53 1287   1413      
6 MPSEB HYDEL AVAILABILITY     21.62 7   230    
7 DEEMED EXPORT TO MSEB FROM PENCH   -0.80 0   -24      
8 MPSEB TOTAL AVAILABILITY     337.35 1294   1619    
9 INDIRA SAGAR (NHDC)     43.34 0   540      
10 OMKARESHWAR HYDEL PROJECT (NHDC)   24.75 52   246      
11 INJECTION FROM STOA     1.21 0   4    
12 DRAWAL SCHEDULE OF Sardar Sarovar at MP periphery 78.15 257   541    
13 DRAWAL SCHEDULE OF ISGS (WR+ER+NR) Ex WR Periphery 427.00 6985   1697    
a NTPC KSTPS     101.56 0   420      
b NTPC VSTPS     195.58 691   768      
c SEEPAT     44.77 187   184      
d NTPC KAWAS     16.38 311   68      
e NTPC GANDHAR     13.94 89   36      
f NPC   KAPP     5.89 1659   24      
g NPC   TAPS     17.47 2908   72    
h NTPC ER IMP(+)\EXP(-)     0.00 542   0      
i KSTPP_II  ER     7.93 506   34      
j DVC ER     23.47 92   92      
k MATATILA     0.00 0   0      
l RIHAND     0.00 0   0      
14 DRAWAL SCHEDULE OF ISGS (WR+ER+DVC+NR) MP Periphery     401.38 1737   1601    
#### DRAWAL SCHEDULE OF Hirakud OHPC (ER)at MP periphery 7.46 30   31      
15 DRAWAL SCHEDULE OF POWER PURCHASE Ex WR Periphery 0.00 0   0      
16 SALE OF POWER -40.71 -40   -120      
17 EXCHANGE OF ENERGY AT Ex MP Periphery 0.00 0   0      
18  BANKING OF ENERGY AT Ex MP Periphery -75.78 -340   -278      
19 DRAWAL SCHEDULE OF POWER PURCHASE Ex MP Periphery 0.00 0   0      
20 DRAWAL SCHEDULE OF STOA (WHEELING)   -1.21 0   -4      
21 DRAWAL SCHEDULE OF SEZ Ex MP Periphery   2.53 11   10      
22 TOTAL DRAWAL SCHEDULE AT MP PERIPHERY   364.35 1624   1750      
23 TOTAL DRAWAL  WITHIN MPSEB PERIPHERY   376.82 1698   1782       CHECKING
24 UNSCHEDULE INTERCHANGE (UI)     12.46 74   32        
25 RADIAL SUPPLY TO RSEB (GS-RPS+GS-B.MANDI+SEOPUR-SWM) -0.90              
26 EXPORT TO LALITPUR   (UPSEB)     0.00             -117.70
27 Export on Ujjain-Kota  / Bina (UP) To Morwa /SMP-SEOPUR 0.00 0   0      
27 MPSEB EX-Periphery SUPPLY EXCL AUX CONSUMPTION 782.56 3044   4191      
25 MPSEB EX-Periphery SUPPLY INCL AUX CONSUMPTION     819.94   3171     4331  
Previous Year Same Day LOAD RELIEF/ SHEDDING            
Schedule   768   1112     1163
M.P.S.E.B. Supply Ex.Aux.Cons.   (LU)  691.77 Unschedule   0   0      
Morning Peak                     (MW)             3035                
Evening Peak                     (MW)             3545 TOTAL   768   1112      
MPSEB SUPPLY E.A.C. 09-10/08-09 (%) 113.13 FREQUENCY (Hz) 49.75   49.64      
UNREST. DEMAND INCLUDING FREQUENCY CORRECTION141 MW/Hz  (MW) 3847   5354      
HOURLY AVERAGE LOAD ( MW) 3261 Max Load (MW) 4191 L. F  % 77.80      
P.L.F.   &   GENERATION  (MPSEB) DAILY MONTHLY YEARLY
PLF GEN PLF GEN PLF   GEN
1 THERMAL GENERATION TARGET PLF% & LU (R-03) 77.73 547.10 77.73 4923.87 75.53   53154.84
2 THERMAL GENERATION  PLF% & LU    ** 50.28 353.87 54.08 3425.51 60.17   42347.90
3 LAST YEAR THERMAL GEN.  PLF% & LU 44.18 308.20 42.38 2651.88 59.60   41060.23
4 % CHANGE W.R.T. LAST YEAR   13.82 14.82 27.61 29.17 0.96   3.14
5 % ACHIEVEMENT W.R.T. TARGET  64.68 64.68 69.57 69.57 79.67   79.67
  Supply in LU DAILY 10-11 DAILY 09-10 MONTHLY  
10-11
MONTHLY             09-10 Yrly 10-11   Yrly 09-10
6 MP SUPPLY Ex MP PERIPHERY
( EXCL. AUX. CONS.)
782.56 691.77 6935.25 6457.97 90665.03   84962.28
  Demand Met is Excluding Auxiliary Consumption    ** 210 MW AMK # 5   considered for PLF wef 01.09.2009