STATE LOAD DESPATCH CENTRE,MPPTCL :JABALPUR
ENERGY BALANCE SHEET FOR DATED:- 10-Jul-2010
Page-2
SL
NO
PARTICULARS UNITS IN
(LU)
MORNING PEAK
MW AT 05:00 Hrs
EVENING PEAK
MW AT 22:00 Hrs
1 THERMAL GENERATION     356.75 1425 1597  
2 HYDEL   GENERATION     22.94 105   219      
3 TOTAL   GENERATION     379.69 1530   1816      
4 AUXILIARY CONSUMPTION     37.61 128   144    
5 MP THERMAL AVAILABILITY (Excl. Aux. Cons.)   319.18 1297   1453      
6 MPSEB HYDEL AVAILABILITY     22.90 105   219    
7 DEEMED EXPORT TO MSEB FROM PENCH   -0.32 0   0      
8 MPSEB TOTAL AVAILABILITY     341.76 1402   1672    
9 INDIRA SAGAR (NHDC)     46.12 182   540      
10 OMKARESHWAR HYDEL PROJECT (NHDC)   26.36 104   251      
11 INJECTION FROM STOA     1.41 9   16    
12 DRAWAL SCHEDULE OF Sardar Sarovar at MP periphery 77.49 86   455    
13 DRAWAL SCHEDULE OF ISGS (WR+ER+NR) Ex WR Periphery 435.60 1786   1886    
a NTPC KSTPS     101.67 425   419      
b NTPC VSTPS     199.09 814   843      
c SEEPAT     44.77 187   184      
d NTPC KAWAS     18.48 68   110      
e NTPC GANDHAR     17.12 71   109      
f NPC   KAPP     5.89 25   24      
g NPC   TAPS     17.47 73   72    
h NTPC ER IMP(+)\EXP(-)     0.00 0   0      
i KSTPP_II  ER     7.64 32   32      
j DVC ER     23.47 92   92      
k MATATILA     0.00 0   0      
l RIHAND     0.00 0   0      
14 DRAWAL SCHEDULE OF ISGS (WR+ER+DVC+NR) MP Periphery     409.47 1685   1778    
#### DRAWAL SCHEDULE OF Hirakud OHPC (ER)at MP periphery 7.18 30   30      
15 DRAWAL SCHEDULE OF POWER PURCHASE Ex WR Periphery 0.00 0   0      
16 SALE OF POWER -64.78 -269   -120      
17 EXCHANGE OF ENERGY AT Ex MP Periphery 1.63 188   -63      
18  BANKING OF ENERGY AT Ex MP Periphery -76.72 -311   -278      
19 DRAWAL SCHEDULE OF POWER PURCHASE Ex MP Periphery 0.00 0   0      
20 DRAWAL SCHEDULE OF STOA (WHEELING)   -1.41 -9   -16      
21 DRAWAL SCHEDULE OF SEZ Ex MP Periphery   2.58 11   11      
22 TOTAL DRAWAL SCHEDULE AT MP PERIPHERY   348.26 1379   1767      
23 TOTAL DRAWAL  WITHIN MPSEB PERIPHERY   364.73 1487   1527       CHECKING
24 UNSCHEDULE INTERCHANGE (UI)     16.47 108   -240        
25 RADIAL SUPPLY TO RSEB (GS-RPS+GS-B.MANDI+SEOPUR-SWM) -1.02              
26 EXPORT TO LALITPUR   (UPSEB)     0.00             -141.28
27 Export on Ujjain-Kota  / Bina (UP) To Morwa /SMP-SEOPUR 0.00 0   0      
27 MPSEB EX-Periphery SUPPLY EXCL AUX CONSUMPTION 779.35 3184   4006      
25 MPSEB EX-Periphery SUPPLY INCL AUX CONSUMPTION     816.96   3312     4150  
Previous Year Same Day LOAD RELIEF/ SHEDDING            
Schedule   787   954     982
M.P.S.E.B. Supply Ex.Aux.Cons.   (LU)  751.85 Unschedule   0   0      
Morning Peak                     (MW)             3358                
Evening Peak                     (MW)             3640 TOTAL   787   954      
MPSEB SUPPLY E.A.C. 09-10/08-09 (%) 103.66 FREQUENCY (Hz) 49.74   49.80      
UNREST. DEMAND INCLUDING FREQUENCY CORRECTION141 MW/Hz  (MW) 4008   4988      
HOURLY AVERAGE LOAD ( MW) 3247 Max Load (MW) 4006 L. F  % 81.06      
P.L.F.   &   GENERATION  (MPSEB) DAILY MONTHLY YEARLY
PLF GEN PLF GEN PLF   GEN
1 THERMAL GENERATION TARGET PLF% & LU (R-03) 77.73 547.10 77.73 5470.97 75.46   53638.71
2 THERMAL GENERATION  PLF% & LU    ** 50.69 356.75 53.74 3782.26 60.08   42704.65
3 LAST YEAR THERMAL GEN.  PLF% & LU 49.29 344.41 43.07 2996.29 59.49   41404.64
4 % CHANGE W.R.T. LAST YEAR   2.83 3.58 24.77 26.23 0.98   3.14
5 % ACHIEVEMENT W.R.T. TARGET  65.21 65.21 69.13 69.13 79.62   79.62
  Supply in LU DAILY 10-11 DAILY 09-10 MONTHLY  
10-11
MONTHLY             09-10 Yrly 10-11   Yrly 09-10
6 MP SUPPLY Ex MP PERIPHERY
( EXCL. AUX. CONS.)
779.35 751.85 7714.60 7209.82 91444.39   85714.13
  Demand Met is Excluding Auxiliary Consumption    ** 210 MW AMK # 5   considered for PLF wef 01.09.2009