STATE LOAD DESPATCH CENTRE,MPPTCL :JABALPUR
ENERGY BALANCE SHEET FOR DATED:- 17-Jul-2010
Page-2
SL
NO
PARTICULARS UNITS IN
(LU)
MORNING PEAK
MW AT 05:00 Hrs
EVENING PEAK
MW AT 22:00 Hrs
1 THERMAL GENERATION     358.53 1462 1502  
2 HYDEL   GENERATION     40.10 83   245      
3 TOTAL   GENERATION     398.63 1545   1747      
4 AUXILIARY CONSUMPTION     35.72 132   135    
5 MP THERMAL AVAILABILITY (Excl. Aux. Cons.)   322.86 1330   1367      
6 MPSEB HYDEL AVAILABILITY     40.04 83   245    
7 DEEMED EXPORT TO MSEB FROM PENCH   -0.96 0   -24      
8 MPSEB TOTAL AVAILABILITY     361.94 1413   1587    
9 INDIRA SAGAR (NHDC)     71.50 425   599      
10 OMKARESHWAR HYDEL PROJECT (NHDC)   39.37 244   292      
11 INJECTION FROM STOA     3.32 4   24    
12 DRAWAL SCHEDULE OF Sardar Sarovar at MP periphery 63.78 173   458    
13 DRAWAL SCHEDULE OF ISGS (WR+ER+NR) Ex WR Periphery 414.39 1736   1659    
a NTPC KSTPS     86.29 364   382      
b NTPC VSTPS     201.57 840   843      
c SEEPAT     42.18 183   87      
d NTPC KAWAS     25.35 107   106      
e NTPC GANDHAR     25.53 108   107      
f NPC   KAPP     6.68 28   28      
g NPC   TAPS     0.00 0   0    
h NTPC ER IMP(+)\EXP(-)     0.00 0   0      
i KSTPP_II  ER     7.80 33   33      
j DVC ER     18.76 74   74      
k MATATILA     0.00 0   0      
l RIHAND     0.24 1   1      
14 DRAWAL SCHEDULE OF ISGS (WR+ER+DVC+NR) MP Periphery     392.01 1647   1574    
#### DRAWAL SCHEDULE OF Hirakud OHPC (ER)at MP periphery 7.38 31   31      
15 DRAWAL SCHEDULE OF POWER PURCHASE Ex WR Periphery 0.00 0   0      
16 SALE OF POWER -13.60 -40   -120      
17 EXCHANGE OF ENERGY AT Ex MP Periphery 1.69 189   -63      
18  BANKING OF ENERGY AT Ex MP Periphery -156.61 -721   -578      
19 DRAWAL SCHEDULE OF POWER PURCHASE Ex MP Periphery 0.00 0   0      
20 DRAWAL SCHEDULE OF STOA (WHEELING)   -3.32 -4   -24      
21 DRAWAL SCHEDULE OF SEZ Ex MP Periphery   2.43 10   10      
22 TOTAL DRAWAL SCHEDULE AT MP PERIPHERY   286.38 1254   1257      
23 TOTAL DRAWAL  WITHIN MPSEB PERIPHERY   303.96 1240   1528       CHECKING
24 UNSCHEDULE INTERCHANGE (UI)     17.58 -14   271        
25 RADIAL SUPPLY TO RSEB (GS-RPS+GS-B.MANDI+SEOPUR-SWM) -1.47              
26 EXPORT TO LALITPUR   (UPSEB)     0.00             -171.84
27 Export on Ujjain-Kota  / Bina (UP) To Morwa /SMP-SEOPUR 0.00 0   0      
27 MPSEB EX-Periphery SUPPLY EXCL AUX CONSUMPTION 778.62 3326   4031      
25 MPSEB EX-Periphery SUPPLY INCL AUX CONSUMPTION     814.35   3458     4166  
Previous Year Same Day LOAD RELIEF/ SHEDDING            
Schedule   565   1233     1312
M.P.S.E.B. Supply Ex.Aux.Cons.   (LU)  737.25 Unschedule   0   0      
Morning Peak                     (MW)             3261                
Evening Peak                     (MW)             3534 TOTAL   565   1233      
MPSEB SUPPLY E.A.C. 09-10/08-09 (%) 105.61 FREQUENCY (Hz) 49.41   49.44      
UNREST. DEMAND INCLUDING FREQUENCY CORRECTION141 MW/Hz  (MW) 3974   5343      
HOURLY AVERAGE LOAD ( MW) 3244 Max Load (MW) 4126 L. F  % 78.63      
P.L.F.   &   GENERATION  (MPSEB) DAILY MONTHLY YEARLY
PLF GEN PLF GEN PLF   GEN
1 THERMAL GENERATION TARGET PLF% & LU (R-03) 77.73 547.10 77.73 9300.65 75.02   57025.81
2 THERMAL GENERATION  PLF% & LU    ** 50.94 358.53 52.28 6254.84 59.44   45177.23
3 LAST YEAR THERMAL GEN.  PLF% & LU 47.33 336.52 45.62 5436.94 58.83   43845.29
4 % CHANGE W.R.T. LAST YEAR   7.64 6.54 14.59 15.04 1.03   3.04
5 % ACHIEVEMENT W.R.T. TARGET  65.53 65.53 67.25 67.25 79.22   79.22
  Supply in LU DAILY 10-11 DAILY 09-10 MONTHLY  
10-11
MONTHLY             09-10 Yrly 10-11   Yrly 09-10
6 MP SUPPLY Ex MP PERIPHERY
( EXCL. AUX. CONS.)
778.62 737.25 13120.74 12390.43 96850.53   90894.74
  Demand Met is Excluding Auxiliary Consumption    ** 210 MW AMK # 5   considered for PLF wef 01.09.2009