BACK                                                                                                                                             MAIN PAGE

NATIONAL HIGHWAY ZONE, MADHYA PRADESH 

ANNUAL PLAN APPROVED BY MOSRT&H FOR 2006-2007

Sr. No Head NH. No. NAME OF WORKS LENGTH IN KMS / M. APPROX. COST (Rs. In Crores)  REMARKS
A. Expressway   Nil      
  i) FS/Detailed Engineering          
             
             
      Sub Total :-      
  ii) L.A.          
      Sub Total :-      
  iii) Construction          
      Sub Total :-      
      Total 0    
B. Four Lanning          
  (i) FS/Detailed Engineering 7 & 27 FROM Km.141/6 to 229/2, Km.243/6 to 352/6 and Km.46/6 to 98/250 of NH-27 165 3.5  
      Sub Total 165 3.5  
  ii) L.A.          
      Sub Total :-      
  iii) Construction          
      Sub Total :-      
      Total 165.00 3.50  
C. Bypasses          
  i) FS/Detailed Engineering 12 Ext Khilchipur Town 7.00 0.12  
    69 Itarsi 8.00 0.13  
    7 Sihora, Panagar 5.00 0.10  
    59A Harda & Timrni 5.00 0.10  
    86Ext Sagar 15.00 0.15  
  ii) L.A. only          
             
  iii) Construction          
             
      Total 40.00 0.60  
D. R.O.B./R.U.B.          
  i) FS/Detailed Engineering 86 Km.5/10 Sagar 1.00 0.10  
      Sub Total :-      
  ii) L.A.          
             
             
  iii) Construction 7 Maihar 5.00 8.00  
             
      Total 6.00 8.10  
E. Missing Link/New National Highways          
  (i) FS/Detailed Engineerig          
      Total 0.00 0.00  
             
F. Widening to two lane. 86 Km.44 to 50, 52, 54 to 58, 60, 61, 65, 66 to 68 20.00 3.50  
    69 Km.62 to 88 27.00 4.50  
    69 Km.140 to 189 49.00 7.00  
    78 Km.5 to 13, 37 to 73, 103 to 132 75.00 10.60  
    92 10, 11, 15 to 19, 28 to 32, 33 to 45, 79 to 88 25.00 4.00  
    59A Km.192 to 215, 276/6 to 278, 242 to 265 37.00 5.60  
    59A 5 to 21, 93 to 109 34.00 5.60  
    75 84/4 to 104, 63, 64 22.60 3.50  
      Total 289.60 44.30  
             
G. Widening to two lane with Geometrics Improvement. .          
      Total 0.00 0.00  
             
H. Strengthening 3 Km.410 to 416, 426 to 438 20.00 3.50  
    7 Km.473 to 484 12.00 2.50  
    69 Km.56 to 60 5.00 1.00  
      Total 37.00 7.00  
             
             
I. Improvement of riding quality          
      Total 0.00 0.00  
             
J. Paved Shoulders NHs L.S.      
      Total 0.00 0.00  
             
K. Widening/reconstruction of culvert All NHs Reconstruction of old and damaged culverts in All NHs   2.00  
      Total   2.00  
L. Major Bridge          
  (i) Reconstruction/ Widening 75Ext Nowa Nalla 1.00 3.20  
    7 423/4 Hiran 1.00 2.50  
      Sub Total   5.70  
             
  (ii) Rehabilitation 12 Sindoor (130/2, 162/4, 167/4) 3.00 0.50  
    3 Km.136/6   0.30  
    3 Km.128/2   0.30  
    12 Birang Km.119   0.30  
    3 Km.553/8   0.30  
    59A Nemawar Bridge   0.30  
    3 Deb Bridge 119/4   0.30  
      Sub Total   2.30  
             
M Minor Bridge          
  (i) Reconstruction/ Widening 59 Km.6/2, 20/10, 31/4, 36/6, 61/8 4.00 0.80  
    92 Br. In Km.42/2, 64/4 2.00 0.80  
    12Ext km.49/6, 51/6 2.00 0.80  
    3 Km.180/10, 217/6 2.00 0.80  
    3 Km.350/4, 356/6, 357/4, 360/8, 362/2, 402/6 6.00 2.50  
    3 Km.402/6, 409/8, 415/6, 436/4, 439/2, 542/4 6.00 3.50  
    27 Km.52/8, 61/6, 63/6, 65/2, 65/8 5.00 1.50  
    86Ext Km.39/6 to 102 2.00 1.00  
    12A Km.46/2 1.00 0.30  
      Total 30.00 12.00  
N. Road Safty & environment NHs L.S.   1.50  
             
  (i) Crash Barrier     L.S.    
      Total   1.50  
             
O. Feasibility study/ D.P.R. for bridges     L.S. 1.00  
             
      Total   1.00  
P. Misc.   Road safety works, way side amenities 0.00 0.00  
      L.A., Survey & Investigation, Bridge approach, protection works, paved shoulder with side drains   2.00  
      Survey Investigation, repair rehabilitation minor bridge costing less than Rs.50 Lakhs   0.00  
      Total   2.00  
      Grand Total   90.00