MADYA PRADESH WATER SECTOR RESTRUCTURING PROJECT

Proposed Schemes:-

Major Schemes : 4
Medium Schemes : 27
Minor Schemes : 564
Lift Irrigation : 59
Total
: 654

S.No Basin Major Medium Minor Lift Irrigation Total
1 Chambal 1 7 115 15 138
2 Betwa 1 8 229 12 250
3 Ken 1 3 110 4 118
4 Sindh 1 3 49 0 53
5 Tones 0 6 61 28 95
Total
4 27 564 59 654